Condo renovation cost in Miami is decided by three things: the scope you choose, the condition behind the walls, and the building you live in. The first two exist everywhere. The third is why the same bathroom costs more on the fourteenth floor than it does in a house in Hollywood.
What the building adds to the price
A tower sets the hours work may happen, books the service elevator, schedules the riser shut-offs and often dictates the debris route. None of that changes the materials. It changes the number of days on site, and days on site are labour. Work that can only run five hours a day, four days a week, takes longer than the same work in a house, and the price reflects that before a single tile is chosen. The rules your building applies are the first thing we read.
Where the money actually goes
- Demolition and haul away, which in a tower includes protection and a booked elevator
- Plumbing and electrical, and far more of it when fixtures move
- The shower base, waterproofing and the flood test
- Tile, stone and anything cut to size
- Fixtures, glass and finish carpentry
- Permits and inspections where the work requires them
Fixtures and tile are the part most people price first, and they are the part that varies most by choice rather than by condition. The work behind them is what holds the number steady, and it is the larger share of any condo renovation cost.
We do not quote over the phone
Nobody can give you a condo renovation cost without seeing the unit. A number offered on a call is a guess at what is behind your walls, and the guess gets corrected later, usually upward and usually mid-job. We measure, read the building rules, write the scope, and the price stays at the number on that scope. The same holds for a single bathroom.
Apartment or condo, the questions are the same
Whether you call it an apartment or a condo, what we need to know does not change: are fixtures moving, is the floor coming up, what does management require, and when may work happen. Approval usually comes first, and an association packet can hold a start date for weeks. That belongs in the budget as time rather than as a surprise.
Time is part of the number
A longer job is a more expensive job, and in a tower the calendar is not entirely ours. We put a realistic timeline in writing alongside the price, so the two can be read together.
Get a real number
We work in buildings across South Florida: Brickell, Aventura, Hollywood, Hallandale Beach, Golden Beach, Pompano Beach and Boca Raton. Send us your unit, your building rules and what you want changed, and we will come and measure. The number you get back is written, itemised, and the one you pay.